Bio-rad ChromLab™ Software Bedienungsanleitung Seite 102

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 178
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 101
5 | Plumbing and Priming the NGC Chromatography Systems
100 | NGC Chromatography Systems and ChromLab Software
Plumbing All NGC Systems
Table 8 lists the tasks for plumbing all NGC systems. The tasks are explained in
detail in the sections that follow.
1.
Inlet tubing to the pump head wash port on system pump A
2.
Pump head wash priming line
to the pump head wash port on
system pump B
3.
1/4-28 union to the priming line on system pump B
4.
Pump head wash inlet to the 1/4-28 union attached to the pump head
wash priming line on system pump B
5.
On the sample inject valve:
Sample loop
Injection port
Waste lines (2)
6.
Tube #2 from the outlet on the conductivity flow cell to the inlet on the
40 psi backpressure regulator
Plumbing the System Pumps Wash Lines
All configurations ship with the pump wash system preplumbed except for the inlet
and outlet tubing for the pump head wash. Plumbing the inlet and outlet tubing is
specific to the type of pump (system pump configuration or sample pump). The
following images show a detailed view of the connectivity and flow direction of the
rinse solution through the tubing segments for the system pumps and the sample
pump.
Table 8. Plumbing tasks for all NGC systems
Task
Seitenansicht 101
1 2 ... 97 98 99 100 101 102 103 104 105 106 107 ... 177 178

Kommentare zu diesen Handbüchern

Keine Kommentare